• Pool Type
  • Project Type Parks & Recreation
  • Project Service Facility Audit
  • StatusCompleted 2016
  • ArchitectKimley-Horn & Associates, Inc.

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Oak Ridge, TN City of (audit)

Oak Ridge, TN

Kimley-Horn and Associates commissioned Counsilman-Hunsaker to provide a swimming pool audit for the Oak Ridge Outdoor Swimming Pool.  One of the largest pools in country, the 58,800 sq. ft. two-million-gallon spring-fed swimming pool was originally constructed in 1944 and underwent a major renovation in 1993. Although repairs had been made on an as-needed basis, the audit assisted in identifying items that were substandard and/or not operating as designed.