fbpx

50% Construction Documents

At this time, the drawings should have pool piping and surge tank (if applicable) shown as well as filter room sections drawn. Future coordination from the design team will hinge a lot off of our drawings so the more we get done the better. Full specifications should begin to be developed and provided if requested by the architect.

Powered by BetterDocs