Counsilman-Hunsaker worked with WTA Architects to study renovation or replacement options for the existing Bay County outdoor swimming pool. The pool has long served the community during the traditional Memorial Day to Labor Day season. Options were considered to renovate the pool utilizing Myrtha’s RenovAction technology to keep the main footprint with a slight reduction, and several new pool options were also considered to allow the pool to have a smaller but more functional footprint. Capital and operational costs were developed, along with a projection of future operating costs.