An in-depth swimming pool audit was performed by Counsilman-Hunsaker, resulting in recommendations for renovations including updating the equipment in the mechanical room and replacing the piping, main drains, and wall inlets of the indoor 25-yard pool.
Aquatic Design and Engineering
After a thorough investigation of the existing facility and review with school district staff, it was determined by the city that repairing the existing pool would serve as a cost effective method to achieve the desired programming goals for the facility. Counsilman-Hunsaker teamed with The Ballard Group to create construction documents for the renovation recommendations selected by the owner from the audit report.