Houston Rockets

Houston, TX

VIEW ALL PROJECTS

The newly constructed Houston Rockets Training Clubhouse is a state-of-the-art facility that combines cutting-edge technology with a sleek, modern design, all built on an existing warehouse building site. A key element of the space’s innovation is the integration of advanced hydrotherapy amenities. The construction team had to carefully cut out the pit for the hydrotherapy pools from the existing warehouse floor, transforming the area into a dedicated space for recovery and rejuvenation. The new training center is a testament to the Rockets’ commitment to providing their players with the best athletic development and health resources.

At the heart of the training center lies an expansive hydrotherapy area, 50% larger than the space available at the team’s arena. This enhanced hydrotherapy zone includes a jet pool, hot and cold tubs, and a steam room, all carefully designed to cater to the players' diverse recovery needs. The custom-built pools offer contrast therapy and targeted muscle recovery, allowing players to recover efficiently after intense workouts or games. These therapeutic features are integrated seamlessly with other treatment stations and medical rooms, offering a holistic approach to healing and injury prevention.

The clubhouse’s innovative design emphasizes blending high-performance training with comprehensive treatment options. The training zone is strategically intertwined with medical examination and recovery rooms, ensuring that a player’s physical health is addressed in one centralized location. The new clubhouse will provide the Rockets with a premier environment to enhance their athletic performance and prioritize player well-being, reinforcing the team’s commitment to cutting-edge recovery solutions and state-of-the-art training facilities.

Visit the official Houston Rockets site

Back to Projects

Pool Type

Training Facility

HydroTherapy Pool

Project Type

NCAA / Pro Sports

Training Facility

Project Service

Design Services

Most Recent Project

Completed 2024

Architect

Populous

Construction

Whiting Turner

Project Amenities

Three Hydroworx Pools

14 ft. Classic plunge (cold)

  • Water depth of 3 ft. 5 in.
  • 1,500 gallons
  • 105 sq. ft.

14 ft. Classic plunge (hot/cold)

  • Water depth of 3 ft. 5 in.
  • 1,500 gallons
  • 105 sq. ft.

2000 Series

  • Moveable floor – variable depth
  • 5,170 gallons
  • 96 sq. ft.

Similar Projects

Splash Station

View Project

One Cardinal Way Ballpark Village

View Project

Northern Regional Recreation Center

View Project

New Search

All Types

  • All Types
  • Indoor
  • Outdoor
  • Competition
  • Instructional
  • Recreation
  • Wellness and Therapy
All Sectors

  • All Sectors
  • Parks and Recreation
  • University Athletics
  • Univ. Campus Recreation
  • Schools - K-12
  • Hospitality
  • Non-Profit
  • Waterparks
  • NCAA/Pro-Sports
  • Military
  • Private Development
  • Other
All Services

  • All Services
  • Audit
  • Design
  • Operations
  • Studies
All Locations

  • All Locations
  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado
  • Connecticut
  • Delaware
  • District Of Columbia
  • Florida
  • Georgia
  • Hawaii
  • Idaho
  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Louisiana
  • Maine
  • Maryland
  • Massachusetts
  • Michigan
  • Minnesota
  • Mississippi
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Hampshire
  • New Jersey
  • New Mexico
  • New York
  • North Carolina
  • North Dakota
  • Ohio
  • Oklahoma
  • Oregon
  • Pennsylvania
  • Rhode Island
  • South Carolina
  • South Dakota
  • Tennessee
  • Texas
  • Utah
  • Vermont
  • Virginia
  • Washington
  • West Virginia
  • Wisconsin
  • Wyoming
  • International