Laguna Woods Village commissioned Counsilman-Hunsaker to provide a swimming pool audit for the Club House #5 swimming pool and spa, both constructed in 1978. Only minor improvements to address maintenance issues have been made to the pool’s mechanical system since the facility’s original opening. The pool and spa are currently being used by the residents ofLagunaWoodsVillagefor lap swimming, wellness, and fitness aquatics.
A site visit was conducted to assist in defining a course of action regarding the future of the pool and spa. The Counsilman-Hunsaker team evaluated the chemical treatment systems, associated metering pumps, and water chemical controllers for the two existing bodies of water.
Aquatic Design & Engineering
Based on the audit report, the Village chose to renovate the entire pool mechanical room, replace all of the pool mechanical equipment, and much of the building’s infrastructure. The Counsilman-Hunsaker/ Robert Boarders and Associates team was selected to redesign the pool equipment.