GH2 Architects and Northeastern State University commissioned Counsilman-Hunsaker to provide a swimming pool audit for the Motor Pool which features an eight lane, 25-yard lap pool. The aquatic facility audit focused on items that were substandard and assisted in defining a course of action regarding the future of the facility. Items observed were the existing pool and pool finishes, as well as the pool mechanical systems.
Aquatic Design & Engineering
Pleased with the evaluations and findings from the audit, the team of Counsilman-Hunsaker and GH2 Architects was directed to move forward with construction design services for the repairs of the existing pool to include:
- Main drain replacement with VGB certified drains and covers
- Replacement of the pool perimeter ceramic tile band
- Replacement of the existing pool return inlets
- Replacement of underwater pool lights
- Install flow meters per jurisdictional code requirements
- Install an ultra-violet light disinfection system