As part of the design for a new Student Recreation Center, Counsilman-Hunsaker was retained to provide an on-site facility evaluation of the existing pool. The purpose of the evaluation was to determine the best approach for updating the pool that was originally built in 1963. Based on the final report, the university decided to do a complete mechanical system replacement along with other renovations to the pool structure. It is scheduled to be completed in November 2014.