In September 2005, Thurston High School retained TMP Architects and Counsilman-Hunsaker to evaluate their existing 25-yard competition pool and develop options for the future. Included with the evaluation of the existing pool and respective mechanical systems, Counsilman-Hunsaker provided cost estimates for the items identified in the evaluation.
Counsilman Hunsaker was hired in 2007 to complete modernization of the pool filtration, mechanical, chemical systems. This work included new recirculation pumps, water level controller, main drains, inlets, gutter outlets and all associated piping.