Audit Services

Understanding how to manage aging swimming pools

In-depth analyses put you ahead of the curve to make knowledgeable decisions regarding repair, renovation, or replacement.

See HydroLogic Blog for our Audit Video Series

Safeguard the Future for Everyone Counsilman-Hunsaker’s engineering services can help you better understand what to do with an aging swimming pool. Aquatic facility physical audits have helped hundreds of owners and operators discover their options for modernizing an aging facility by identifying needed repairs, renovations, or replacements to safeguard your aquatic facility's future and ensuring the facility continues to run smoothly.  Get our e-Book on the Model Aquatic Health Code

Engineering and Experience You Can Trust

With a Counsilman-Hunsaker Physical Audit and Needs Assessment, our experienced specialists and engineers analyze the infrastructure of your facility from top to bottom, identifying items that may become problematic. We focus on the systems, structures, and code compliance so that its condition and potential future life can be evaluated with certainty. This detailed analysis includes an investigation into programmatic flexibility of the existing pool structure and equipment, identifies issues and substandard conditions, and provides budgetary recommendations for repair or replacement.

Each aquatic facility Physical Audit and Needs Assessment includes, but is not limited to, expert inspection of:

  • Pool structure and finishes
  • Recirculation systems, piping, fittings, valves
  • Filtration systems and overflow recovery systems
  • Water chemistry treatment systems
  • Pumps, flow meters, gauges, all controls
  • Code-compliance with state and local health codes and the Model Aquatic Health Code
  • Deck equipment

We Help You Choose the Best Direction for Your Aquatic Facility

Our engineering team provides a post-audit summary report identifying any repairs, compliance requirements that need to be met, and a probable cost estimate. This report, presented in everyday language that is easily understood, provides clear and itemized improvements and fixes for inclusion into any future budgets, and we'll work with you to establish a preventative maintenance plan for the future upkeep of your facility.

With Counsilman-Hunsaker's practical, innovative, and expert knowledge and experience in the aquatic industry, you'll be equipped to choose the best direction to ensure aquatics continues to be available for everyone in your community.

See our audit projects

OUR EXPERTISE

Inspiring others to learn more

If you’re worrying about the age of your aquatic facility, experiencing unidentified problems, considering the need for a new facility, or simply curious where your facility is with its life expectancy, it’s time to consider a physical audit.

Aquatic facility physical audits have helped hundreds of owners and operators discover their options for modernizing their aging facility, whether by replacing equipment, renovating, or building a new facility, safeguarding their aquatic centers’ future. Get in touch with us today.

Contact us
  • audit services analysis natatorium aquatics

    Waverly Municipal Swimming Pool

    The City of Waverly, Iowa's Municipal Swimming Pool has proudly served the community for an impressive 56 summers. To plan for the future of Memorial Park, MSA and Counsilman-Hunsaker were enlisted to provide comprehensive planning services, specifically focusing on developing options for the future of the swimming pool. The study encompassed a thorough examination of ...

    See our audit projects
  • audit services analysis natatorium aquatics

    Kimbell Bay and City Splash Pools

    At the request of the City of Yukon, Oklahoma, Counsilman-Hunsaker was retained to complete a comprehensive swimming pool assessment for the Kimbell Bay and City Splash Pools. These iconic outdoor pools have proudly served the community for over half a century. The primary objective of this assessment was to meticulously identify any areas within the ...

    See our audit projects
  • audit services analysis natatorium aquatics

    Michigan State University Pools (Audit)

    Michigan State University commissioned Counsilman-Hunsaker to provide a facility assessment of three facilities: IM West, IM Circle, and Jenison pools followed the subsequent design of a replacement outdoor 50-meter pool and a feasibility study for a new aquatic facility on campus. The IM West facility consists of two pools, an indoor stretch 25-yard competition pool, ...

    See our audit projects
  • audit services analysis natatorium aquatics

    Charles H. Doherty Swimming Pool (Audit)

    The City of Ingleside, Texas commissioned Counsilman Hunsaker to provide a swimming pool assessment for the Charles H. Doherty Swimming Pool which had not been operational since Hurrican Harvey hit the city in 2017. The purpose of the swimming pool assessment was to identify items that were substandard in the pools, identify items not to ...

    See our audit projects
  • Pirate's Bay Waterpark aquatic center waterslide lazy river

    Pirates Bay Family Aquatic Center

    Full Circle Client In the 2007 Baytown Marketing Development Plan, city residents pointed to a need for a large family aquatic center to draw from inside and outside their community. The Wayne Gray Sports Complex, located near a major highway ad an ample footprint to add attractions and accomplished this goal. The study also included ...

    See our audit projects

OUR EXPERTISE