Counsilman-Hunsaker conducted an inspection of the existing pool at Alak School that was nearing the end of its useful life. The inspection confirmed that a replacement would be more effective than a renovation.
A narrative was provided for options for replacement once funding was approved by North Slope Borough School District for the design/construction.