• Pool Type Indoor 25-Yard
  • Project Type K-12
  • Project Service Design Services
  • StatusCompleted 2019
  • ArchitectACI Boland, Inc.

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Belton High School Natatorium

Belton, MO

In April of 2017, Belton voters approved a $20 million bond issue funding construction projects for the Belton School District #124. The bond financed the construction of additions and improvements to the high school campus, including adding an additional 25 classrooms, counseling and office spaces, a gymnasium, lobby and locker rooms, an aquatic center, and a performing arts center; and completing facility maintenance and improvement projects throughout the district.

The new 16,750 sq. ft. natatorium includes:

4,800 sq. ft. Competition Pool

  • Eight 25-yard lap lanes
  • ADA ramp entry
  • Stair entry
  • Two 1-meter diving springboards
  • New timing system

Aquatic Operations Services:

Counsilman-Hunsaker was also contracted by Belton School District #124 to provide pre-opening services for the new pool. Services included operations training, a Standard Operating Procedures Manual, and a Certified Pool-Spa Operator training course for staff. During the operations training, Counsilman-Hunsaker staff led Belton School staff through facility operations, maintenance procedures, emergency action plans, and other operational items. The Standard Operating Procedures Manual included personnel policies, facility-specific procedures, emergency action plans, and job descriptions.  The Certified Pool and Spa Operator Course was provided through the Pool and Hot Tub Alliance and was a two-day course, providing a five-year certification to participants. The course focused on maintenance training, water quality, daily operations, and maintenance planning.