In 2014, Counsilman-Hunsaker provided a conceptual design and feasibility analysis for replacement of the 50-year-old Bunworth Memorial Pool. Since the pool was in poor condition and showed signs of aging, a new facility would offer recreational, therapy, instructional, fitness, and competitive programs in the community. The feasibility study provided a space program analysis and project costs for three conceptual options detailing site-specific construction estimates with line item costs for each proposed space. Along with each concept, a revenue and expense analysis were provided to give a complete picture of what the facility would cost to build and operate.
Photos courtesy of Veteran Strategies, Inc.