Choose Categories

Filters 0 applied

No filters available

All Types

  • All Types
  • Indoor
  • Outdoor
  • Competition
  • Instructional
  • Recreation
  • Wellness and Therapy
All Sectors

  • All Sectors
  • Parks and Recreation
  • University Athletics
  • Univ. Campus Recreation
  • Schools - K-12
  • Hospitality
  • Non-Profit
  • Waterparks
  • NCAA/Pro-Sports
  • Military
  • Private Development
  • Other
All Services

  • All Services
  • Audit
  • Design
  • Operations
  • Studies
All Locations

  • All Locations
  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado
  • Connecticut
  • Delaware
  • District Of Columbia
  • Florida
  • Georgia
  • Hawaii
  • Idaho
  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Louisiana
  • Maine
  • Maryland
  • Massachusetts
  • Michigan
  • Minnesota
  • Mississippi
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Hampshire
  • New Jersey
  • New Mexico
  • New York
  • North Carolina
  • North Dakota
  • Ohio
  • Oklahoma
  • Oregon
  • Pennsylvania
  • Rhode Island
  • South Carolina
  • South Dakota
  • Tennessee
  • Texas
  • Utah
  • Vermont
  • Virginia
  • Washington
  • West Virginia
  • Wisconsin
  • Wyoming
  • International

Willow Creek HOA Pool

Project

The Willow Creek HOA pool is an aging facility that was experiencing issues with water drainage and settling of the pool deck. The facility needed an assessment of the pool to determine which aspects of the facility do not meet code and require updates soon. Counsilman-Hunsaker worked with Essenza Architecture and other collaborating engineering firms […]

View Project

North Slope Borough School District – Alak School Pool

Project

Counsilman-Hunsaker conducted an inspection of the existing pool at Alak School that was nearing the end of its useful life. The inspection confirmed that a replacement would be more effective than a renovation. A narrative was provided for options for replacement once funding was approved by North Slope Borough School District for the design/construction. Visit […]

View Project

Manitou Springs Pool and Center

Project

Counsilman-Hunsaker conducted an assessment of the indoor five-lane lap pool at Manitou Springs which was reaching the end of its life. This was the main focus of the facility audit. The facility also has an indoor residential style fiberglass spa, an outdoor in-deck concrete spa, and an outdoor kiddie pool. All pools are used frequently […]

View Project

Murphy Park Pool

Project

Counsilman-Hunsaker was contracted by Progressive Commercial Aquatics to conduct an assessment on both the outdoor competition pool and an outdoor children’s/leisure pool at Murphy Park. The existing facility was seeing significant differential settlement and heave in the deck areas around the pool. One side of each pool was significantly lower than the other. Counsilman-Hunsaker contracted […]

View Project

University of North Georgia – Gainesville Aquatics Center

Project

Counsilman-Hunsaker assessed the existing lap pool and mechanical room located in the Gainesville Aquatic Center. Originally constructed in the 1960s, the pool is utilized daily for lap swimming and water aerobics class only – no diving or competitions. The lap pool was constructed with an aluminum pool shell that had succumbed to major leaking. The […]

View Project

Little Caillou Park Pool

Project

Little Caillou Park Pool was originally opened in 1961 in Chauvin, Louisiana as an outdoor body of water for recreation and lap swimming. The unique trapezoid shape covers approximately 5,300 sq. ft. of water, and up to 11’-0” of water depth. The pool was later renovated to install a permanent bulkhead and 25-yard lap swimming […]

View Project

Washington University Pool

Project

The I.E. Millstone Pool facility at Washington University in St. Louis was evaluated for deficiencies related to current code standards, structural issues, and detailed cost estimates were developed along with recommendations for remediating those deficiencies and defined a course of action regarding the facility’s future. The final report identified items for immediate repair or replacement. […]

View Project

Niles West High School Pool

Project

Niles West High School Swimming Pool was evaluated for deficiencies related to current code standards, structural issues, and detailed cost estimates were developed along with recommendations for remediating those deficiencies and defined a course of action regarding the facility’s future. The final report identified several items requiring immediate attention, including sections of pool deck and […]

View Project

University of Florida – James W. (Bill) Heavener Football Training Center

Project

In August 2022, the University of Florida celebrated the opening of the James W. “Bill” Heavener Football Training Center, just ahead of the upcoming season. The center serves as a world-class, 140,000-square-foot indoor training facility and day-to-day home for Florida football student-athletes and staff. The impressive building includes two floors of high-performance training spaces for […]

View Project

Whitecliff Pool

Project

The Whitecliff Pool facility was evaluated for deficiencies related to current code standards, structural issues, and detailed cost estimates were developed along with recommendations for remediating those deficiencies and defined a course of action regarding the facility’s future. A major renovation and small repairs had recently been completed, but several issues required investigation. The final […]

View Project