Choose Categories

Filters 0 applied

No filters available

All Types

  • All Types
  • Indoor
  • Outdoor
  • Competition
  • Instructional
  • Recreation
  • Wellness and Therapy
All Sectors

  • All Sectors
  • Parks and Recreation
  • University Athletics
  • Univ. Campus Recreation
  • Schools - K-12
  • Hospitality
  • Non-Profit
  • Waterparks
  • NCAA/Pro-Sports
  • Military
  • Private Development
  • Other
All Services

  • All Services
  • Audit
  • Design
  • Operations
  • Studies
All Locations

  • All Locations
  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado
  • Connecticut
  • Delaware
  • District Of Columbia
  • Florida
  • Georgia
  • Hawaii
  • Idaho
  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Louisiana
  • Maine
  • Maryland
  • Massachusetts
  • Michigan
  • Minnesota
  • Mississippi
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Hampshire
  • New Jersey
  • New Mexico
  • New York
  • North Carolina
  • North Dakota
  • Ohio
  • Oklahoma
  • Oregon
  • Pennsylvania
  • Rhode Island
  • South Carolina
  • South Dakota
  • Tennessee
  • Texas
  • Utah
  • Vermont
  • Virginia
  • Washington
  • West Virginia
  • Wisconsin
  • Wyoming
  • International

Salisbury University – Maggs Physical Activities Center

Project

The Maggs Physical Activities Center Natatorium is home to the Salisbury University men’s and women’s swimming teams. In 2020, the facility underwent a sizable renovation project which took eight months to complete. The men’s and women’s swimming teams’ home was completely gutted and refurbished over those eight months. One of the renovation’s highlights was a […]

View Project

Pharr-San Juan-Alamo Independent School District

Project

In May 2021, the Pharr-San Juan-Alamo Independent School District hosted grand opening ceremonies for two identically-designed swimming facilities at PSJA Early College High School in San Juan and PSJA Memorial Early College High School High School in Alamo. The project, which totaled $11.8 million combined, equipped each of the two campuses mentioned with its own […]

View Project

Dulce Community Center

Project

Dulce Community Center celebrated its grand opening in August 2020. The 100,000 sq. ft. community center, a planned replacement facility for the Jicarilla Apache Nation, focused on creating healthy spaces – inside and out. Centrally located in the heart of Dulce, the replacement facility serves as a physical and cultural center point for the Jicarilla […]

View Project

Cuyahoga Heights High School Pool

Project

The Cuyahoga Heights High School (CHHS) swimming pool is an L-shaped pool including six 25-meter lanes for competitive swimming and a 1-meter diving board for competitive diving. The pool also includes a shallow water area for swim instruction. The staff at CHHS noticed that a crack had developed in the pool’s deep end wall and […]

View Project

Springfield Downtown YMCA

Project

Counsilman-Hunsaker worked with Sports Facilities Advisory and the Greater Springfield Partnership to develop options, capital costs, and operational costs for several scenarios for an expansion to the Springfield Downtown YMCA aquatic spaces. The goal was to help balance the needs of aquatic users at the YMCA to provide both warm and cold water to attract […]

View Project

Highland Aquatic Center

Project

FGM Architects retained Counsilman-Hunsaker to assist with the planning for a replacement for the existing City of Highland outdoor swimming pool. Counsilman-Hunsaker had previously conducted a facility audit that found the pool was at the end of its useful life. Several options were developed that looked at several sites around the City of Highland, including […]

View Project

Port St. Lucie Aquatic Center

Project

Counsilman-Hunsaker and Kimley-Horn performed a Needs Assessment, Program Requirements, and Financial Performance Study to help the City of Port St. Lucie with specific information for the design of a new outdoor aquatic center. Several options were developed to meet the aquatic needs of the community and generate outside visitation to the city; a smaller community […]

View Project

Cayman Islands Aquatic Sports Association

Project

The Cayman Islands Aquatic Sports Association (CIASA) contracted with Counsilman-Hunsaker to provide an Aquatic Operational Study for the proposed CIASA Aquatic Centre. The Aquatic Centre will consist of a covered, outdoor 50-meter by 25-meter all-deep competition pool with a separate 10-lane, 25-meter shallow water pool. Counsilman-Hunsaker conducted a needs assessment, developed an expense analysis, and […]

View Project

City of Auburn

Project

Counsilman-Hunsaker worked with Sports Facilities Advisory to create an Aquatic Facility Market Opportunity report for the City of Auburn, Maine. The report provided an initial look at the type and size of an indoor aquatic center, along with the anticipated capital costs to develop the aquatic center. Based on the size of Auburn and the […]

View Project

Upper Arlington High School Natatorium

Project

The new Upper Arlington High School celebrated its grand opening in August of 2021. It was constructed on the same 34-acre parcel that had been home to the existing high school for over 60 years. The new High School complements five new or renovated buildings within the district, all part of a large master plan […]

View Project