October 2013, Counsilman-Hunsaker was commissioned by MP Engineers and the Dormitory Authority of the State of New York (DASNY) to provide a swimming pool audit for the indoor competition pool at the Borough of Manhattan Community College. The audit evaluated the existing 30-year-old pool along with its mechanical and chemical treatment systems. The report provided an opinion of probable cost for items in need of maintenance and repair, including the condition of the recirculation pumps and strainers, filter media, buried piping, the chemical treatment systems, valves and piping assembly within the surge tank, the make-up water and water level control system, and the access ladder into the surge tank. Based on the report’s recommendations, Counsilman-Hunsaker was retained to provide engineering documents for the recommended renovations to the pool consisting of:
· Mechanical equipment
· Filtration system
· New tile
· Piping within the mechanical room, surge tank, and suction to the main drains
· Timing system enhancements
· New motorized vinyl pool cover