In a collaborative effort, Counsilman-Hunsaker and Convergence Architecture conducted a comprehensive swimming pool assessment of the Willow Creek Park District's outdoor swimming pool and indoor therapy pool.
The primary objective of this assessment was to meticulously identify any areas within the pools that fall below acceptable standards, including substandard features, elements that do not meet current industry swimming pool design standards or equipment that is not functioning as intended. The assessment aimed to provide invaluable insights to aid in determining the future course of action for the aquatic facility.
A detailed written report was generated, outlining the findings of the assessments, and a comprehensive presentation was delivered to the project steering committee. This presentation comprehensively outlined the assessment results, along with the associated costs required to maintain the pools in operation. This collaborative effort enables the Willow Creek Park District to make informed decisions and take necessary actions to ensure the optimal operation and maintenance of their aquatic facility.