Zion-Benton Township High School evaluated their existing natatorium and decided to construct a new pool within the existing space. Along with a new building, the plan was also to reconstruct the existing natatorium for other much-needed school functions.
Part of the challenge was that the existing structure, built in the 1970s, was octagon-shaped and required a unique design. A new natatorium was designed successfully despite the odd shape of the space.