Choose Categories

No filters available

All Types

  • All Types
  • Indoor
  • Outdoor
  • Competition
  • Instructional
  • Recreation
  • Wellness and Therapy
All Sectors

  • All Sectors
  • Parks and Recreation
  • University Athletics
  • Univ. Campus Recreation
  • Schools - K-12
  • Hospitality
  • Non-Profit
  • Waterparks
  • NCAA/Pro-Sports
  • Military
  • Private Development
  • Other
All Services

  • All Services
  • Audit
  • Design
  • Operations
  • Studies
All Locations

  • All Locations
  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado
  • Connecticut
  • Delaware
  • District Of Columbia
  • Florida
  • Georgia
  • Hawaii
  • Idaho
  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Louisiana
  • Maine
  • Maryland
  • Massachusetts
  • Michigan
  • Minnesota
  • Mississippi
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Hampshire
  • New Jersey
  • New Mexico
  • New York
  • North Carolina
  • North Dakota
  • Ohio
  • Oklahoma
  • Oregon
  • Pennsylvania
  • Rhode Island
  • South Carolina
  • South Dakota
  • Tennessee
  • Texas
  • Utah
  • Vermont
  • Virginia
  • Washington
  • West Virginia
  • Wisconsin
  • Wyoming
  • International

Sheridan County YMCA – Community Aquatic Center

Project

In 2015, Counsilman-Hunsaker conducted an aquatic facility audit on the two existing swimming pools at the Sheridan County YMCA, constructed in 1965 and 1985. The audit identified items that were substandard in the pools, highlighted items that didn’t meet industry swimming pool design standards, and inspected pool equipment that wasn’t operating as designed. Although the […]

View Project

Brigham Young University (BYU) – John H. Hart Physical Education Building

Project

The Aquatic Center, located in the John H. Hart Physical Education Building and originally constructed in 1968, was showing signs of age and physical obsolescence. In May 2012, Counsilman-Hunsaker performed an assessment of the existing conditions of the pool related to compliance with current health codes and industry standards. An examination of the overall condition […]

View Project

Olympic Pool (Study)

Project

Counsilman-Hunsaker supported Marmon Mok to perform an evaluation and feasibility study for the existing Olympic-size swimming pool in Kerrville. Several options were explored that considered repairing the existing pool, replacing the existing Olympic-size pool with a new outdoor leisure pool, and a third option for a new indoor pool for Kerrville. The study also included conversations […]

View Project

Cape Girardeau Natatorium (Study)

Project

Counsilman-Hunsaker was retained to conduct a feasibility study for the City of Cape Girardeau and the Cape Girardeau School District. Collectively, the two entities had approved $10,000,000 to provide new aquatic offerings within the city. Counsilman-Hunsaker was tasked with identifying how to meet the needs of the local aquatic user groups, with potential options including a single […]

View Project

Eanes ISD – Westlake High School (Study)

Project

Counsilman-Hunsaker worked with Eanes ISD to conduct a revenue and expense analysis for their planned future indoor competition pool at Westlake High School. The study projected operational expenses for the aquatic center and examined various possible revenue streams, from running in-house aquatic programs to partnering with a local swim club to rent lane space when the […]

View Project

Dexter High School and Wylie Elementary School (Audit and Design)

Project

Counsilman-Hunsaker was commissioned by TMP and Dexter Public Schools to provide a swimming pool audit for the existing competition pool at Dexter High School (DHS) and the competition and instructional pools at Wylie Elementary School (WES).  The DHS facility was originally designed in 2000 and had experienced issues with the performance of its vacuum sand […]

View Project

Wheeling YMCA (Audit)

Project

Constructed in 1970, the Wheeling YMCA pool is currently utilized for many programs such as learn-to-swim, fitness classes, social events, and competitive swimming practice. The YMCA staff and board members identified several deficiencies and desires for the facility and commissioned Mills Group and Counsilman-Hunsaker in 2019 to confirm the deficiencies and identify priorities plus any […]

View Project

Moseley Pool

Project

In 2019, Counsilman-Hunsaker was retained by the City of DeSoto to prepare a facility audit and conceptual plans for renovating and replacing Moseley Pool. Our team met with facility staff and provided a report on the sub-standard conditions of Moseley Pool. The information included an opinion on the probable construction costs to address the identified […]

View Project

Forest Grove Aquatic Center (Study)

Project

Counsilman-Hunsaker supported PLACE Architecture to study options to renovate or replace the existing Forest Grove Aquatic Center. The aquatic center was constructed in 1967 and has undergone several renovations since it has opened. The study included an audit of the existing pools and physical structures of the aquatic center as well as several options for consideration including […]

View Project

Belton School District (Operations Services)

Project

Counsilman-Hunsaker was contracted to provide a facility-specific Standard Operating Procedures Manual as well as maintenance and operational services for the Belton ISD Aquatic Center. The SOP Manual consisted of: Aquatic staff policies and procedures for employment and at the workplace Operational procedures, including opening, daily, and closing duties of all staff Orientations, weekly in-services, emergency action […]

View Project