Choose Categories

No filters available

All Types

  • All Types
  • Indoor
  • Outdoor
  • Competition
  • Instructional
  • Recreation
  • Wellness and Therapy
All Sectors

  • All Sectors
  • Parks and Recreation
  • University Athletics
  • Univ. Campus Recreation
  • Schools - K-12
  • Hospitality
  • Non-Profit
  • Waterparks
  • NCAA/Pro-Sports
  • Military
  • Private Development
  • Other
All Services

  • All Services
  • Audit
  • Design
  • Operations
  • Studies
All Locations

  • All Locations
  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado
  • Connecticut
  • Delaware
  • District Of Columbia
  • Florida
  • Georgia
  • Hawaii
  • Idaho
  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Louisiana
  • Maine
  • Maryland
  • Massachusetts
  • Michigan
  • Minnesota
  • Mississippi
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Hampshire
  • New Jersey
  • New Mexico
  • New York
  • North Carolina
  • North Dakota
  • Ohio
  • Oklahoma
  • Oregon
  • Pennsylvania
  • Rhode Island
  • South Carolina
  • South Dakota
  • Tennessee
  • Texas
  • Utah
  • Vermont
  • Virginia
  • Washington
  • West Virginia
  • Wisconsin
  • Wyoming
  • International

Libertyville High School Natatorium

Project

In early 2017, the Community High School District 128 Board of Education approved the construction of a new pool at Libertyville High School. The new $21.5 million natatorium includes 34,000 sq. ft. of space with locker rooms, spectator areas, and support spaces. Libertyville High School’s previous pool was built in 1971 and was 25-yards long […]

View Project

John Jay College of Criminal Justice – Haaren Hall

Project

The John Jay College of Criminal Justice, a Manhattan college within the City University of New York system, is housed in the historically significant Haaren Hall, built in 1903. The facility includes the world’s largest criminal justice library, a swimming pool, classrooms, faculty and administrative offices, a theater, and a gym. Additional renovations included the […]

View Project

Pinehurst Country Club (Audit and Study)

Project

Counsilman-Hunsaker was retained by the Pinehurst Country Club to prepare a facility audit and conceptual plans for renovating or replacing the clubhouse pool. Counsilman-Hunsaker met with facility staff and the members’ steering committee and later provided a sub-standard-conditions report for the main pool and wading pool. The report included an opinion of probable construction costs to […]

View Project

Bowie State University – Leonidan S. James Physical Education Complex (Audit)

Project

Due to water loss issues in 2008, Bowie State University closed their 35-year-old indoor swimming pool, which is located on campus in the Leonidan S. James Physical Education Complex. Counsilman-Hunsaker performed an aquatic audit to identify recommended repairs for the pool with an opinion of construction cost for the repairs. Based on these recommendations, the pool re-opened in 2010. In […]

View Project

Mitchell City Pool

Project

Counsilman-Hunsaker was retained by the City of Mitchell to prepare a facility audit and conceptual plans for renovating or replacing Mitchell City Pool. Counsilman-Hunsaker met with the facility staff and provided a sub-standard-conditions report for the Mitchell City Pool. The report included an opinion of probable construction costs to address conditions identified. The report also […]

View Project

Kootenai Wellness Aquatic Center (Study)

Project

In May of 2019, Counsilman-Hunsaker was retained by the Libby Park District to complete a feasibility study for the Kootenai Wellness Aquatic Center. Previously in 2018, a survey conducted by the Park District concluded that 96% of those surveyed would support a public pool to meet the needs of the community, and several preliminary design […]

View Project

John Day Aquatic Center (Study)

Project

The City of John Day, Oregon retained Counsilman-Hunsaker in August of 2018 to complete a feasibility study for a new aquatic facility to serve both the City of John Day and the surrounding community. The study explored several options that included both indoor and outdoor facilities that would replace the existing city pool. For the second phase […]

View Project

Mission Bay Aquatic Facility (Study)

Project

In October of 2019, Counsilman-Hunsaker was contracted by Scott Perrin to create a Safety Plan for a new facility he was planning in Mission Bay, California. The Safety Plan included staffing plans, emergency action plans, biohazard action plans, and training plans for all of the staff positions. The Safety Plan follows all applicable state and local codes […]

View Project

Jackson County Recreation Center (Study)

Project

Jackson County commissioned Clark Nexsen and Counsilman-Hunsaker to provide an in-depth study for their upcoming recreation and aquatic center expansion. The study included potential revenue and projected expenses for their preferred concept, affording the county a better understanding of how to move forward with the expansion.

View Project

Charlotte Country Day School

Project

In 2020, Charlotte Country Day School called upon Counsilman-Hunsaker to develop an Operational Business Plan for a new aquatic center and gymnasium. The developed Master Facilities Plan aimed to create an expense budget, identify revenue opportunities, and provide knowledge and insight into aquatic operations overall. The creation of the Klein Family Natatorium and the new […]

View Project